top of page
N62473-15-C-2213
Erosion Control Brown St. ~ Award amount $493,544.94
​Erosion Control Project on Brown Street:
​
-
Installed two flood control channels.
-
Installed flood control curbing.
-
Installed 4’ boulders 95 of them.
-
Installed ground cover rocks as specified.
-
Installed weed control barrier two layers in all areas of the project.
-
Installed split face cinder block wall around sun shade for erosion control.
-
Built 18’x18’steel shade structure with slab.
-
Installed trees, bushes and headers.
-
Installed back flow preventer, irrigation control system, and necessary control valves for stations.
-
Installed necessary piping, bubblers and drip systems for trees and shrubs.
-
Installed sidewalk with hand rails.
1/35
bottom of page